A non-profit corporation organized exclusively for religious, charitable and educational purposes as specified in section 501(C)(3) of the internal revenue code. Managed and operated by an unpaid board of directors and volunteers.

Well development (the two steps below) went on without major issues. Thanks for praying!!

  • Step#5: Insert the casing/ slotted casing at the well bottom, which basically is PVC rim that supports the borehole walls to ensure that the walls do not collapse, leaving a one meter piece of PVC casing protruding above the ground level to ensure that run-off rain or other water and silt does not find its way into the borehole.~~Wrapping up by Saturday (8/8/15)
  • Step#6: Pack the circumference of the well on the exterior of the casing using specially graded sand or gravel that serves as a water filter. ~~Wrapping up by Saturday (8/8/15)
Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

Tag Cloud

A Psalm-a-Day

Seeing the Joy and Praise of the Psalmist

LoveInspiredOutreach

A non-profit corporation organized exclusively for religious, charitable and educational purposes as specified in section 501(C)(3) of the internal revenue code. Managed and operated by an unpaid board of directors and volunteers.

Allendale Outlook

News and Stories from APS

Mobility Worldwide

Empowering People By Providing Mobility & More

%d bloggers like this: